Skip to content

LSE’s Centre Building Redevelopment

A state-of-the-art facility built to inspire

Innovative learning space fit for leaders of the future

Large staircase with seating in the middle that have people sat and working and talking

Key takeaways

13

storeys high

4

outdated buildings replaced

15,500

m sq of teaching space created

  • Created state-of-the-art facilities, including modern offices, study areas, and teaching theatres, fostering an inspiring learning environment. 

  • Implemented eco-friendly building practices and materials, achieving high sustainability standards and recognised as BREEAM Outstanding. 

  • Achieved significant savings through design reviews and market testing, ensuring affordability without compromising quality. 

The 13- storey Centre Building is the largest project commissioned in LSE’s120-year history. It is also the highest building on campus, offering spectacular views across London. 
 
Replacing four outdated campus buildings has given the university a new heart amid the bustle of central London, with facilities now matching its world-class standard of teaching.  
 
With its bold and beautiful design, a learning environment has been created to inspire staff and students with modern offices, a dedicated alumni centre, collaborative and independent study areas, teaching theatres and rooms, break-out and social spaces four lecture theatres, including an innovative LSE style theatre. To facilitate interaction, a public square has been placed at the heart of the building, creating a new focal point for students and staff to interact while linking Houghton Street to the Library Plaza and connecting Lincoln’s Inn Fields on the western edge of the campus to the LSE buildings to the east. 

LSE’s values of adaptability and teamwork resonated with our own culture of innovation and collaboration and these came together strongly. As the main contractor for the redevelopment we worked closely with LSE to bring this building to life. During pre-construction we collaborated with LSE and the design team to develop a buildable and affordable solution. Conscious of being cost effective, we market tested key packages and identified a significant shortfall, prompting design reviews and resulting in significant savings. Working with the architectural, structural and MEP consultants we reorganised a number of space-planning elements – saving money without compromising on any key requirements. 

Following delivery of the Centre Building, Mace has been appointed by LSE to construct a second building which will house the Marshall Institute for Philanthropy and Social Entrepreneurship, teaching facilities, the academic departments of Accounting, Finance and Management, as well as sports and arts rehearsal facilities. Construction is now well underway and the project is expected to be completed in 2021.

Accessibility Tools